KYREL3100 - Water and Gas Unit
Ask About This ProductDescription
The front of the body has a door with a lock. The top has a sink and is acid- and base-resistant, with a flat surface of polyester-cored, calcite-filled, gelcoat material. Plumbing runs over the water and gas unit. The water and gas fittings used by the student are mounted on the unit and aligned neatly with the experiment desks.
Delivery and Installation
Before shipment, our products are inspected and packed in special impact-resistant packaging, and are delivered safely to every province of Türkiye.
Installation: In laboratory and classroom projects, installation and commissioning after delivery are carried out by our expert team.
Training and support: User training and after-sales technical support are provided for experiment sets and simulators.